Jump to content

Welcome to Smart Home Forum by FIBARO

Dear Guest,

 

as you can notice parts of Smart Home Forum by FIBARO is not available for you. You have to register in order to view all content and post in our community. Don't worry! Registration is a simple free process that requires minimal information for you to sign up. Become a part of of Smart Home Forum by FIBARO by creating an account.

 

As a member you can:

  •     Start new topics and reply to others
  •     Follow topics and users to get email updates
  •     Get your own profile page and make new friends
  •     Send personal messages
  •     ... and learn a lot about our system!

 

Regards,

Smart Home Forum by FIBARO Team


Building Fibaro Cabinets with dinrail modules


Peertje

Recommended Posts

Hi, Does anyone have experience building a cabinet with dinrail modules with Fibaro dimmer/relais. I have a project with 4 cabinets with about 25 dimming modules per cabinet. I know about the Din-rail adapters but what is inportant reguarding cabels, cooling, spacing, and other stuff ??? Like to hear your thoughts.\

Please login or register to see this image.

/monthly_2020_12/2071488306_cabinetfibaro.jpg.847f3cadf14af3647adebf7ed2c4fa9b.jpg" />

Link to comment
Share on other sites

  • 1 month later...
  • 1 year later...
On 1/29/2021 at 11:00 AM, MarcoSmartForYou said:

hi, if you found a solution pls share it,

 

it would be a great thing!!!!!! 

 

tks

There is a solution (as you can see in picture above)

You can order from Fibaro distributors

Please login or register to see this link.

 

Link to comment
Share on other sites

  • 2 weeks later...

@Peertje @MarcoSmartForYou @Milan Takacs  and other... :)

Hi,
I have now discovered this question.
The introductory balance sheet and especially the cooling is correct.
While the spacing of the Zwave module might not be large in terms of signal interference / spreading, the opposite is true in terms of warming. In particular, dimmers will have significantly higher heat losses than any relay module.
When installing switchboards, it is necessary to start the feeling of so-called warming.
After all, this is also stated in the valid version of the standard EN 61439-1: 2009, which has been adopted in our country under ČSN EN 61439 in several editions.
What is in the picture, ie the set Eufix, 2x Relay, Eufix, 2x Relay ... will ensure local cooling of the module. You will also need to calculate the total warming of the cabinet at the manufacturer's given heat transfer capacity.
It is often a neglected thing that can have all the consequences.

Link to comment
Share on other sites

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

×
×
  • Create New...