Jump to content

Welcome to Smart Home Forum by FIBARO

Dear Guest,

 

as you can notice parts of Smart Home Forum by FIBARO is not available for you. You have to register in order to view all content and post in our community. Don't worry! Registration is a simple free process that requires minimal information for you to sign up. Become a part of of Smart Home Forum by FIBARO by creating an account.

 

As a member you can:

  •     Start new topics and reply to others
  •     Follow topics and users to get email updates
  •     Get your own profile page and make new friends
  •     Send personal messages
  •     ... and learn a lot about our system!

 

Regards,

Smart Home Forum by FIBARO Team


Question

Posted

Dear all, I would like to ask you for help with heating panel. I have issue to run heating schedule. I have 5 rooms control by Popp radiator valves with temp sensor.

I read this forum that this issue may be still ongoing. Do you have any advice hot to resolve heating panel problem? F.e. make scenes for each room?

 

Thank you for advice

Radek

11 answers to this question

Recommended Posts

  • 0
Posted (edited)

Yes I did, 14 scenes with scheduler to control 3 heating zones and all Danfoss valves inside them, 2 to manually control global on/off of two zones from the app, some virtual devices with controls and labels, some variables.

Still to implement the weekend split.

It will not be straight easy if you do not know the system yet and it depends a lot on your heating system design and devices.

Start playing little by little on the technology, design first on paper what you want to get and then go

Edited by Flowy
  • 0
  • Inquirer
  • Posted

    Thx for advice cause realy I could not alive heating panel yet. I am trying to play with block scene and make trigger scheduler, but no success. It would be nic to help me just with scheduler as a trigger to set radiator valve temperature in desire time.

    txn a lot , so for my newbie question.

    Radek

    • 0
    Posted

    as said before it is really dependent on the heating system you have. Electrical radiators? Water radiators? Do you have the main heater/boiler or not? ...

     

    this is an example that sets a group of danfoss valves to 22 degrees at 05:50 in the morning.

    Riscaldamento==attivato is acontrolling variable that I use but for your first tests do not use any variable at all.

     

     

    Please login or register to see this attachment.

    • 0
  • Inquirer
  • Posted

    Please login or register to see this image.

    Please login or register to see this image.

    Please login or register to see this image.

    Please login or register to see this image.

    Dear Flowy

     

    Thank you for your block scene, I have tried to create as well. Look at here.

    Anyway I have standard water radiator heating with gas boiler. But I have connected as well Hot Water tank to radiator system. I am planning to control boiler with Secure Reley and Hot water tank with switch (hot water tank is operating by pump to feed system of hot water). Hot water tank temperature will be control by temp sensor connected with Fibaro universal sensor module and then either hot water tank or boiler will be switch on/ff based on condition of temperature of hot water tank.

    I have installed now 5 heating zones with radiator TRV valve to control heating each room differently.

    Just now when I created such scene attached , it is happened that scene did not start automatically (even it is set on automatical). Pls let me know if scene is created well , just for scheduled set of target temperature on radiator valves. in this case I have 2 valves in living room, one with sensor (Popp one) and second one is Danfoss LC13.

    Thank you for comment

     

    Radek

    Please login or register to see this attachment.

    • 0
    Posted

    heat panel works well for me.  

    • 0
  • Inquirer
  • Posted

    I have tried to delete all heating schedules and made once again. OMG suddenly working heating panel correctly. I do not understand why, cause I have set everything same as before. I deleted all scene for target temp. set.

    Thank you , hopefully will work further on.

    Radek

    • 0
    Posted

    @Radek Slanar, if your example was for Danfoss valves then it is correct.

    Strange you have red box in English but not the green ones.

    Let us know if your heating panel really works completely and always.

    Mine not, but anyhow I have set up a system much better than it, example I manage everything from phone app that you cannot do from panel including vacations setup, global manual overrides, labels with status of zones and manual overrides statuses

    • 0
  • Inquirer
  • Posted

    Dear Flowy, of course I will monitor heating panel schedules if working correctly or not. Anyway I will grade up my system soon to control boiler and hot water tank soon, then I need may be your support as well. :-)

     

    Thx a lot

    Radek

    • 0
  • Inquirer
  • Posted

    Regarding language issue, I am not sure why happen if I switched between Czech and English once. May be this is question for Fibaro support.

    • 0
  • Inquirer
  • Posted

    Dear all,

     

    I am going to implement boiler relay for controlling of gas boiler (free voltage contacts - non pontentional) with Secure SSR303 relay. I have set up heating panel (still working OK) and I have 4 heating zones in heating panel. Each zone has temperaturu sensor. My question is if can I make Connection Deveces for each heating zone with 1 boiler Secure relay. F.e 1st zone temp sensor 1 and Secure relay, 2nd zone next connection temp sensor 2 with Secure relay. It means totaly I will have 4 connection of 4 temp sensor with 1 Secure relay. Is that scenario will function and in case of temperature of 1 zone <  settargettemp then relay will be ON, after reaching settargettemp , then relay will be OFF? Does all 4 zones will do the same all time ? means if even 1 zone temp<settargettemp then relay will be ON, end as well if all zones reach settargettemp then relay will be OFF.

    Thank you for advice.

    Radek

    • 0
  • Inquirer
  • Posted

    Dear all, I have included Horstmann Secure SSR303 relay to system, but when I tried to make Linked Devices - Heating , this device is not shown as switch ON/OFF device. I am not if this is bug or there is not supported function in HCL.

     

    Instead of heating panel schedule I tried to make now scene for heating. 1 scene control if any of zone is temp. below set temp. then variable (Heating is) ON .. why variable is that in the future I need to check either boiler will be ON or Hot Water Tank ON (according measured temp.)

    2nd scene is to make heating OFF in case of all zones reach required temp. with set schedule.

    Could you look at it and let me know if function OK.. for me now OK..I am just testing Boiler relay ON / OFF if any of condition are OK or NG.

    Thx a lot for your comments

    Radek

    In scene translation  NEBO = OR , A = AND, Pak = THEN, Kotlove Rele = Boiler Relay (Secure SSR303), VYTAPENI = HEATING ON, Vypnout = HEATING OFF

    Please login or register to see this attachment.

    Please login or register to see this attachment.

    Please login or register to see this attachment.

    Please login or register to see this attachment.

    Please login or register to see this attachment.

    Join the conversation

    You can post now and register later. If you have an account, sign in now to post with your account.

    Guest
    Answer this question...

    ×   Pasted as rich text.   Paste as plain text instead

      Only 75 emoji are allowed.

    ×   Your link has been automatically embedded.   Display as a link instead

    ×   Your previous content has been restored.   Clear editor

    ×   You cannot paste images directly. Upload or insert images from URL.

    ×
    ×
    • Create New...